Rigol DM3068 Spécifications Page 38

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 70
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 37
RIGOL Chapter 2 Performance Test
Service Guide for DM3068
2-8
2. 5 Routine Test
2.5.1 Zero-offset Test
The zero-offset test inspects the meters offset performance at the point of zero. It is
necessary only when a regular offset is occurred to a function or range.
To perform a zero-offset test:
1. Make sure you have carefully read the Test Conditions.
2. Use a 4-terminal short-circuiter to short connect the HI-LO and Sense HI-LO for
DC voltage and resistance measurements (see figure below) and open both
200mA and 10A current input terminals in current measurement.
3. Perform a step-by-step test for the functions under different ranges specified in
the following table and set the integration time to 100PLC. Please note that none
of the math function is allowable unless otherwise stated.
4. Compare the tested results with the limits in the table.
Figure 2-2 Zero-offset test connection
Table2-3 Zero-offset test items
Function
[1]
Range
Input
signal
Quick
Test
[3]
Allowable Error Range
24 hours
90
days
1
year
DC Voltage
200.000mV
short
Q
±4μV
±5μV
±5μV
2.00000V
short
±10μV
±12μV
±12μV
20.0000V
short
±80μV
±100μV
±100μV
200.000V
short
Q
± 1.2mV
± 1.2mV
± 1.2mV
1000.00V
short
± 6mV
± 10mV
± 10mV
DC Current
200.000μA
open
Q
± 24nA
± 30nA
± 30nA
2.00000mA
open
± 60nA
± 60nA
± 60nA
20.0000mA
open
Q
±2.4μA
±3μA
±3μA
200.000mA
open
±4μA
±6μA
±6μA
2.00000A
open
Q
±400μA
±400μA
±400μA
10.0000A
open
± 1mA
± 1mA
± 1mA
Vue de la page 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 69 70

Commentaires sur ces manuels

Pas de commentaire